PREKTAL
IndexProjectsPrague CWWTP2023 · Czechia
Water & Wastewater

Prague CWWTP — New Water Line (NVL)

Major upgrade of the Prague Central Wastewater Treatment Plant to meet EU standards.

SectorWater
LocationPrague
CountryCzechia
Year2023
Scale
Scope4 packages
01
Overview

Prague CWWTP

Part of the City of Prague's major wastewater treatment upgrade programme. Provides enhanced treatment capacity to meet EU environmental standards and safeguard the Vltava River. Compliant with Czech water-industry standards.

02 — Scope

Packages delivered.

SCOPE / 01

Civil engineering — excavation, foundations, reinforced-concrete tanks and structures

SCOPE / 02

M&E installations — pumps, blowers, piping, cabling, control systems

SCOPE / 03

Utility connections and process-equipment integration

SCOPE / 04

Drainage, access roads and landscaping

03 — Engineering

Schematic
cross-section.

A — A SECTIONSCALE 1:200REF · Czechia

Indicative engineering schematic — detailed drawings available on request.

07 — Let's build

Let'sbuild somethingbetter.

Tell us about your project. Our team will get back to you within one business day — or skip the form and call us directly.

Prektal · Engineering · Contracting · Foreign TradeEst. 2008 · Headquartered in Sana'a, Yemen