PREKTAL
IndexProjectsEmscher Sewer Commissioning2020 · Germany
Water & Wastewater51 km · Tunnel length

Emscher Sewer Commissioning

51 km deep-tunnel sewer redirecting sewage away from the Emscher River for ecological restoration.

SectorWater
LocationRuhr Region
CountryGermany
Year2020
Tunnel length51 km
Scope4 packages
01
Overview

Emscher Sewer Commissioning

The 51 km Emscher Sewer (AKE) deep-tunnel project redirects sewage away from the Emscher River, enabling ecological restoration of the Ruhr region. Delivered by Emschergenossenschaft. Compliant with German water and environmental standards.

02 — Scope

Packages delivered.

SCOPE / 01

Final civil and mechanical works

SCOPE / 02

Installation and testing of pumps and process equipment

SCOPE / 03

Cabling and control systems

SCOPE / 04

Integration of sewer connections and commissioning of treatment & transfer facilities

03 — Engineering

Schematic
cross-section.

A — A SECTIONSCALE 1:200TUNNEL LENGTH · 51 kmGermany

Indicative engineering schematic — detailed drawings available on request.

07 — Let's build

Let'sbuild somethingbetter.

Tell us about your project. Our team will get back to you within one business day — or skip the form and call us directly.

Prektal · Engineering · Contracting · Foreign TradeEst. 2008 · Headquartered in Sana'a, Yemen