Civil engineering — earthworks, trenching, joint-bay and transition-pit construction
SectorPower
LocationPeterhead → Drax
CountryUnited Kingdom
Year2024
HVDC capacity525 kV / 2 GW
Scope5 packages
01
Overview
Eastern Green Link 2 (EGL2)
A major HVDC cable system reinforcing the UK's transmission network, delivering a 525 kV, 2 GW subsea electricity link between Peterhead (Scotland) and Drax (England). Supporting works for the onshore HVDC cable route and converter-station interfaces. Compliant with SSEN and National Grid technical specifications.
02 — Scope
Packages delivered.
SCOPE / 01
SCOPE / 02
Utility diversions
SCOPE / 03
Cable ducting and pulling chambers
SCOPE / 04
M&E installations
03 — Engineering
Schematic
cross-section.
A — A SECTIONSCALE 1:200HVDC CAPACITY · 525 kV / 2 GWUnited Kingdom
Indicative engineering schematic — detailed drawings available on request.
07 — Let's build
Let'sbuild somethingbetter.
Tell us about your project. Our team will get back to you within one business day — or skip the form and call us directly.
Prektal · Engineering · Contracting · Foreign TradeEst. 2008 · Headquartered in Sana'a, Yemen